SF - Set Time Period Targets

Form: Time Period Targets

For time period targets, specify a mode and a target period for that mode. Then, during design, SAP2000 automatically optimizes the structure to meet the target period using energy considerations. During the optimization process, members with large energy per unit volume are changed more than those with small energy per unit volume.

Note: Auto select section lists must be assigned to frame members for the time period optimization to work. When SAP2000 increases or decreases a section size, it uses the available sizes in the auto select section list. If the appropriate sections are not included in the auto select lists, the displacement target may never be met, no matter how many times the analysis and design are rerun.

Use the Design menu > Steel Frame Design > Set Time Period Targets command to display the Time Period Targets form.

Deactivate Time Period Targets check box. Check this check box to exclude the time periods from a design iteration(s) without deleting them. Uncheck the check box to include time periods in design.

 

See also

Set Displacement Targets